Engineering Solutions
Dredging and outfall laying control at the UTE Combined Cycle Plant, Punta Tigre
About the project
Control bathymetry of the outfall trench dredging, pipeline laying control and control of the pipeline protection placement, using dredging control equipment, dynamic positioning, remote monitoring and singlebeam bathymetry, among others.
Control bathymetry of the outfall trench dredging, pipeline laying control and control of the pipeline protection placement, using dredging control equipment, dynamic positioning, remote monitoring and singlebeam bathymetry, among others.