Skip to content
Dredging and outfall laying control at the UTE Combined Cycle Plant, Punta Tigre
Engineering Solutions

Dredging and outfall laying control at the UTE Combined Cycle Plant, Punta Tigre

About the project

Control bathymetry of the outfall trench dredging, pipeline laying control and control of the pipeline protection placement, using dredging control equipment, dynamic positioning, remote monitoring and singlebeam bathymetry, among others.

Control bathymetry of the outfall trench dredging, pipeline laying control and control of the pipeline protection placement, using dredging control equipment, dynamic positioning, remote monitoring and singlebeam bathymetry, among others.