Skip to content
Sheet piling for the construction of the south apron at the Port of Nueva Palmira
Engineering Solutions

Sheet piling for the construction of the south apron at the Port of Nueva Palmira

About the project

Installation of 300 m of 12 m long AZ70 sheet piles with a vibratory hammer for the construction of the south apron at the Port of Nueva Palmira.

Installation of 300 m of 12 m long AZ70 sheet piles with a vibratory hammer for the construction of the south apron at the Port of Nueva Palmira.